The right repair solves the stated mechanism.

A proposal should connect observation → diagnosis → design objective → installation → verification. If it jumps from one crack to one product, the missing logic is the first thing to question.

Homeowner education · Reviewed November 2026

THE SEQUENCE

Do the decision work in the right order.

  • Stabilize urgent hazards and active water safely.
  • Document the pattern, history, drainage and prior work.
  • Identify the likely force or failure mechanism and the limits of the assessment.
  • Define the objective: water control, structural bonding, lateral restraint, load transfer, lift, stabilization—or a combination.
  • Compare complete scopes, exclusions, permits, monitoring and records.

METHOD MATRIX

What each repair can—and cannot—do.

See illustrated examples of injection, wall braces, carbon fiber and pier underpinning

MethodBest matched toDoes not solve by itselfEvidence to request
Surface seal or patchLimited nonmoving seepage or surface defectsStopping water pressure or stabilizing movementPreparation, product limits and drainage diagnosis
Polyurethane injectionWater control through suitable cracks and jointsRestoring structural capacity by itselfCrack condition, moisture compatibility and warranty
Epoxy injectionBonding suitable, stable cracks where structural continuity is intendedActively moving cracks or unresolved causesEngineer-defined objective, resin data and injection record
Carbon-fiber FRPDesigned reinforcement of eligible concrete or masonry wallsLarge displacement, unsupported connections or settlementSystem report, design, substrate and installation details
Steel beams or bracesInterior restraint where the floor system and slab can support the designWater control or automatic straighteningSpacing, connections, corrosion protection and design
Wall anchors or tiebacksResisting inward wall movement where exterior access and soil conditions allowEvery property line, utility or access conditionAnchor layout, exterior limits and engineer/permit review
Helical or push piersTransferring eligible foundation loads to competent bearingBowing walls, leaks or slabs without load-path analysisDesign loads, installation logs, brackets and monitoring
Drainage and sump systemCollecting and safely discharging water around or below the foundationRepairing a structurally unstable wallDischarge path, pump capacity, backup and service access

ESTIMATE CHECK

Make every bidder answer the same questions.

  • What measured condition is the repair addressing?
  • What alternative explanations or repairs were considered?
  • Is the goal stabilization, correction, water control or cosmetic improvement?
  • Who designed the spacing, loads, connections and material system?
  • What permits, inspections or sealed documents apply?
  • What will be recorded during installation?
  • What is excluded, and what could create a change order?
  • What does the warranty cover—and who must maintain drainage or pumps?

SOURCE TRAIL

Technical references

These are starting references, not a project design. Product eligibility, code acceptance and installation conditions must be checked for the specific home.

REFERENCEAmerican Concrete InstituteRAP-1: Structural crack repair by epoxy injection

Explains repair objectives, applicability, material selection and the need to correct the cause first.

REFERENCEICC Evaluation ServiceEvaluation Report Program

Explains how technical evaluation reports document code compliance and conditions of use for proprietary products.

REFERENCEBuilding America Solution CenterFooting drain pipe

Reference for drainage collection and discharge as a distinct repair category.